Coal block auctions likely by December, power cos to get priority.


Date: 01-11-2014
Subject: Coal block auctions likely by December, power cos to get priority
The coal ministry may commence the auction of coal blocks by early as December this year, highly placed sources in the government told HT. The Cabinet Committee of Economic Affairs (CCEA) is expected to approve the plan soon.

As 79 out of the 214 blocks de-allocated by the Supreme Court relate to the power sector, the move is expected to help power projects with a combined capacity of 40,000 MW, ease chronic power shortages over time and give a fillip to the government’s efforts to revive the economy. Investments of Rs. 2 lakh crore are stuck in these projects

At present, Indian public and private sector banks have a combined exposure of close to Rs. 5 lakh crore in various coal and gas-based power projects. An early auction of coal blocks will provide fuel linkages to stressed power projects and ease power shortages. A steady and quality supply of power is a necessary pre-condition for growth.

“The decision vests with the CCEA.... as soon as the approvals come, we (ministry of coal) will commence auction of coal blocks, by December this year,” the source told HT.

“Those power projects that don’t get a coal block in the auction will be considered for allocation of coal by Coal India Ltd. CIL will import coal to meet any shortfall in its own production and pool this with a part of domestic production,” he said.

The total installed power capacity of the country is 250,000 MW. Coal-based plants account for 150,000 MW or 60% of this.

Coal shortages have short-circuited India’s power capacity addition plans. Coal production could not keep pace with demand from the power sector: in the last 5 years, demand grew 87%, but coal output grew a mere 15%.

Adding to this low production were Letters of Assurance (LoAs) for coal linkages the coal ministry in the previous regime had issued to power projects. Upto 2010, LoAs were issued for projects equivalent to 108,000 MW, though coal available was sufficient to generate only 60,000 MW, or 65% of the coal requirement if power plants operated at 85% of capacity.

As on date, Coal India has signed Fuel Supply Agreement for about 74,000 MW. That still leaves about 14,500 MW already commissioned or to be commissioned in the 12th Plan, without coal linkages provided.

Source : hindustantimes.com

Get Sample Now

Which service(s) are you interested in?
 Export Data
 Import Data
 Both
 Buyers
 Suppliers
 Both
OR
 Exim Help
+


What is New?

Date: 30-04-2026
Notification No. 01/2026-Central Tax (Rate)
Seeks to amend Notification No 9/2025 - Central tax (Rate) to align them with changes made vide Finance Act, 2026

Date: 30-04-2026
Notification No. 01/2026-Integrated Tax (Rate)
Seeks to amend Notification No 9/2025 - Integrated tax (Rate) to align them with changes made vide Finance Act, 2026?

Date: 30-04-2026
Notification No. 01/2026-Union Territory Tax (Rate)
Seeks to amend Notification No 9/2025 - Union Territory ?tax (Rate) to align them with changes made vide Finance Act, 2026?

Date: 30-04-2026
Notification No. 19/2026-Central Excise
Seeks to amend Notification No. 06/2026-Central Excise dated 26.03.2026 to revise the SAED rates on exports of High speed diesel oil outside India.

Date: 30-04-2026
Notification No. 20/2026-Central Excise
Seeks to amend Notification No. 08/2026-Central Excise dated 26.03.2026 to revise the SAED rates on exports of ATF outside India.

Date: 30-04-2026
Notification No. 21/2026-Central Excise
Seeks to amend Notification No. 11/2026-Central Excise dated 26.03.2026 to revise the RIC rates on exports of High speed diesel oil outside India.

Date: 21-04-2026
NOTIFICATION No. 01/2026 – Central Tax
Seeks to extends the due date for furnishing the return in FORM GSTR-3B for the month of March, 2026 till the twenty-first day of April, 2026

Date: 11-04-2026
Notification No. 14/2026-Central Excise
Seeks to amend the Eighth Schedule to the Finance Act, 2002 to increase the tariff rate of Special Additional Excise Duty applicable to High Speed Diesel oil

Date: 11-04-2026
Notification No. 16/2026-Central Excise
Seeks to amend Notification No. 06/2026-Central Excise dated 26.03.2026 to increase the SAED on exports of High speed diesel oil outside India.

Date: 11-04-2026
Notification No. 15/2026-Central Excise
Seeks to amend the Sixth Schedule to the Finance Act, 2018 to increase the tariff rate of Road and Infrastructure Cess applicable to High Speed Diesel oil



Exim Guru Copyright © 1999-2026 Exim Guru. All Rights Reserved.
The information presented on the site is believed to be accurate. However, InfodriveIndia takes no legal responsibilities for the validity of the information.
Please read our Terms of Use and Privacy Policy before you use this Export Import Data Directory.

EximGuru.com

C/o InfodriveIndia Pvt Ltd
F-19, Pocket F, Okhla Phase-I
Okhla Industrial Area
New Delhi - 110020, India
Phone : 011 - 40703001